Construction and part design of a large extension to a processing unit. The processing unit was required to be operation throughout the works which included demolition of half of the existing portal frame building, piling, groundworks, structural steel frame to support six processing vessels up to 90 tonne in weight, cladding, plant enclosures and internal finishing. External works incorporated the provision of a 200,000 litre pumped holding tank.
Working directly with the client, Grundon Waste Management Limited, this project involved the construction of a waste transfer facility, comprising a mixed construction of pre-cast piling, reinforced concrete slabs, steel frame and cladding, as well as rainwater harvesting, fire drench and dust suppression systems.
Design and build of a prestigious new world headquarters for Ricardo on the edge of Shoreham Airport.